|
Total area: 72.000 m². |
|
Location: on the side of Anversa > Liegi motorway and Albert Canal. |
|
Covered warehouse: 10.000 m². |
|
Offices: 600 m². |
|
Connections:
- |
Railway: possibility to connect the site with Anversa > Bruxelles and all the Belgian and European Terminals. |
- |
Riverside: possibility of a riverside quay on the Albert Canal. |
|
|
Container terminal with cranes for handling. |
|
Silos: 30 for a total volume of 15.000 m³. |
|
Completion expected: March 2004. |
|
|